Metallica Metals Intersects High Grade Gold Mineralization in First Drill Holes Completed on Starr G …

metallica metals intersects high grade gold mineralization in first drill holes completed on starr gold silver project

Sumary of Metallica Metals Intersects High Grade Gold Mineralization in First Drill Holes Completed on Starr Gold-Silver Project:

  • Story continues below This has not loaded yet, but your article continues below.
  • Story continues below This has not loaded yet, but your article continues below.
  • ” Figure 1: Location of Metallic Metals’ Starr gold-silver project with respect to adjacent properties including the Moss Lake gold deposit (sources: 2013 NI 43-101 Technical Report and PEA for the Moss Lake Project and Kesselrun Resources October 7, 2020 news release) https://www.
  • com/NewsRoom/AttachmentNg/930d5bde-f688-451a-bee3-e173c1ee2b30 Story continues below This has not loaded yet, but your article continues below.
  • Story continues below This has not loaded yet, but your article continues below.
  • Article content Technical Overview A summary of the first three drill holes completed (STR21-001 to 003) and significant assay intercepts are shown below in Tables 1 and 2, respectively.
  • A photo of mineralization in drill core from Hole STR21-001 is shown below in Figure 4 .
  • Story continues below This has not loaded yet, but your article continues below.

Want to know more click here go to source.

From -

Close
Generic selectors
Exact matches only
Search in title
Search in content

Site Language


By continuing to use the site, you agree to the use of cookies. more information

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close